Latest [May 29, 2026] C_P2W43_2023 Exam Questions – Valid C_P2W43_2023 Dumps Pdf [Q39-Q56]

Share

Latest [May 29, 2026] C_P2W43_2023 Exam Questions – Valid C_P2W43_2023 Dumps Pdf

C_P2W43_2023 Practice Test Questions Answers Updated 82 Questions

NEW QUESTION # 39
Which functions characterize a Strategic analysis as opposed to embedded analysis within the SAP S/4HANA core system? Note: There are 2 correct answers to this question

  • A. Preconfigured Core Data Service (CDS) containing SQL views
  • B. A collection of tools that are not included with core SAP S/4HANA
  • C. SAP Business Objects as a part of SAP Business Warehouse (BW)
  • D. SAP Business Objects Business Intelligence for Visualization

Answer: A,C


NEW QUESTION # 40
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question

  • A. In the material reservation list in inventory management
  • B. Within a maintenance order
  • C. In the list editing (single-level) for maintenance orders
  • D. In the report Material: Where-Used List

Answer: B,D


NEW QUESTION # 41
How is Phase-based Maintenance Processing activated in the SAP system? Note: There are 2 correct answers to this question

  • A. By manually activating the corresponding Business Feature in case Best Practices are not
  • B. Through Best Practices scope items 4HH and 4HI.
  • C. By installing the corresponding enhancement pack and activating the related business function
  • D. Phase-based maintenance is always active in all S/4HANA 2021 editions and above

Answer: B,D


NEW QUESTION # 42
Which default object type do you use to settle a refurbishment order?

  • A. The material
  • B. The WBS element
  • C. The cost center
  • D. The fixed asset

Answer: A


NEW QUESTION # 43
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question

  • A. Assign a subordinate piece of equipment.
  • B. Create a task list for functional location
  • C. Change a reference location.
  • D. Assign documents
  • E. Edit classification data and characteristics.

Answer: C,D,E


NEW QUESTION # 44
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note: There are 3 correct answers to this question

  • A. Find malfunction records already created in a list
  • B. Plan repair work for the responsible work center
  • C. Assign a production resource tool (PRT) to the operation
  • D. Verify planned and actual costs
  • E. Complete the malfunction report

Answer: A,B,E


NEW QUESTION # 45
The planner adds non-stock material in a released maintenance order. What are possible options within the maintenance order? Note: There are 3 correct answers to this question?

  • A. A purchase requisition will ALWAYS be created as soon as the order is saved.
  • B. A purchase requisition can be created automatically as soon as the order is saved.
  • C. A purchase order is created automatically as soon as the order is saved.
  • D. A goods receipt can be posted after the maintenance order is technically completed.
  • E. The maintenance order can be set to TECO before the invoice is created

Answer: A,B,E


NEW QUESTION # 46
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.

  • A. Maintenance activity type
  • B. Order type
  • C. Completion data
  • D. Change documents
  • E. Call object

Answer: C,D,E


NEW QUESTION # 47
To which objects can a personnel number be directly assigned? Note: There are 2 correct answers to this question?

  • A. Planner group
  • B. Maintenance plan
  • C. Business partner
  • D. Work center

Answer: C,D


NEW QUESTION # 48
Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question.

  • A. An object list must have been generated manually or automatically.
  • B. A PM task list with inspection point type must be assigned to the maintenance order
  • C. A checklist type must be assigned to the maintenance order header.
  • D. An Inspection Plan and a technical object must be assigned to the same class.

Answer: B,D


NEW QUESTION # 49
How do you set up the visible tiles for a specific user in SAP Fiori Launchpad? Note: There are 2 correct answers to this question

  • A. By assigning the tiles directly
  • B. By assigning a PFCG role with an SAP Fiori catalog
  • C. By assigning a portal role with an SAP Fiori catalog
  • D. By assigning a PFCG role with an SAP Fiori tile group

Answer: B,D


NEW QUESTION # 50
Which are the prerequisites for Inspection Checklist Processing? Note: There are 2 correct answers to this question

  • A. Inspection point type assigned to the task list header
  • B. Master inspection characteristics assigned to PM task list operations
  • C. Classification data assigned to a technical object
  • D. QM inspection plan with assigned inspection characteristics

Answer: A,B


NEW QUESTION # 51
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance? Note: There are 2 correct answers to this question

  • A. If you use the Resource Scheduling apps, you always dispatch orders and operations.
  • B. The configuration of the order type decides whether you use Resource Scheduling or not.
  • C. Maintenance Planning Buckets give you a list of non-approved notifications
  • D. The order moves to the Preparation phase once it is approved and released

Answer: A,D


NEW QUESTION # 52
Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?

  • A. SAP Lumira Designer
  • B. SAP Asset Strategy and Performance Management
  • C. SAP Predictive Analysis
  • D. SAP S/4HANA Core Data Services

Answer: D


NEW QUESTION # 53
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question?

  • A. Referenced notifications are put in Process again.
  • B. Open reservations are recompiled.
  • C. Open purchase orders are recompiled.
  • D. Open purchase requisitions are recompiled

Answer: B,D


NEW QUESTION # 54
Which of the below objects can you assign in a notification item? Note: There are 2 correct answers to this question

  • A. Only one cause of damage
  • B. Only one object part
  • C. One or more causes of damage.
  • D. One or more object parts

Answer: C,D


NEW QUESTION # 55
How can you assign a material BOM to a piece of equipment?

  • A. Via field model number in the equipment master
  • B. Via creation of an equipment BOM
  • C. Via material BOM header in the serialization data
  • D. Via field construction type

Answer: D


NEW QUESTION # 56
......

C_P2W43_2023 dumps Sure Practice with 82 Questions: https://exam-labs.prep4sureguide.com/C_P2W43_2023-prep4sure-exam-guide.html