NEW QUESTION # 44
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.
- A. The production quantity must lie within the lot-size range of the production version.
- B. The production quantity must only lie within the lot-size range of the routing in the production version.
- C. The basic start date of the order must lie within the validity period of the production version.
- D. The basic end date of the order must lie within the validity period of the production version.
- E. The production version must NOT be deleted.
Answer: A,B,C
NEW QUESTION # 45
Why would you use phantom assemblies?
Note: There are 2 correct answers to this question.
- A. To make the assignment of components easier
- B. To reduce the number of material masters
- C. To enable simple structuring of BOMs
- D. To make the procurement easier
Answer: A,C
NEW QUESTION # 46
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of a material shortage. What must you do?
Note: There are 2 correct answers to this question.
- A. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
- B. Add the agreement to the source list and mark it for MRP relevance.
- C. Add the agreement to the quota arrangement and mark it for MRP relevance.
- D. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
Answer: B,D
NEW QUESTION # 47
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
- A. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator
- B. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator
- C. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator
- D. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator
Answer: C
NEW QUESTION # 48
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.
- A. Select a special explosion type inside the material BOM (bill of material)
- B. Select a special explosion type inside the material master
- C. Select a special procurement type inside the material BOM (bill of material)
- D. Select a special procurement type inside the material master
Answer: C,D
NEW QUESTION # 49
In the context of the capacity scheduling table, how do you define a pacemaker work center?
- A. By assigning it to the capacity scheduling table
- B. By assigning it to the bottleneck operation
- C. By assigning it to the production version
- D. By assigning it to the first operation of a routing
Answer: C
NEW QUESTION # 50
What is the purpose of using a low level code?
Note: There are 2 correct answers to this question.
- A. To determine the priority of alternative components inside the material BOM (bill of material)
- B. To determine the sequence in which materials are planned in MRP
- C. To determine the lowest explosion level at which a material occurs in all the product structures
- D. To determine the use of subitems inside the material BOM (bill of material)
Answer: B,C
NEW QUESTION # 51
Which options do you have to exclude Advanced Planning materials from the standard MRP run in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. Use the material number for selection
- B. Use a different MRP planner for PP/DS materials
- C. Use the special MRP type XO
- D. Use a propagation range
Answer: B,C
NEW QUESTION # 52
Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag?
Note: There are 2 correct answers to this question.
- A. Material
- B. Production version
- C. Work center
- D. Plant
Answer: A,C
NEW QUESTION # 53
Your production planners are supposed to execute planning only for specific resources. What do you use to achieve this in Advanced Planning (PP/DS)?
- A. A planning group
- B. A propagation range
- C. A planning area
- D. A work center hierarchy
Answer: A
NEW QUESTION # 54
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.
- A. Routings
- B. Work center
- C. Bill of material
- D. Production order
Answer: A,C
NEW QUESTION # 55
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?
- A. SAP Signavio Process Intelligence
- B. SAP Signavio Process Insights
- C. SAP Signavio Process Manager
- D. SAP Signavio Process Governance
Answer: C
NEW QUESTION # 56
What are some options for creating a production order?
Note: There are 2 correct answers to this question.
- A. By converting a purchase requisition
- B. By setting a Kanban container to full
- C. By partially converting a planned order
- D. By setting a Kanban container to empty
Answer: C,D
NEW QUESTION # 57
What is a prerequisite for the consumption of planned independent requirements to take place for planning strategy 40 (Planning with final assembly)?
- A. A sales order is created.
- B. A sales order is delivered.
- C. MRP creates a planned order.
- D. MRP creates a dependent requirement.
Answer: A
NEW QUESTION # 58
Which planning strategies can you use in the capacity scheduling table?
Note: There are 2 correct answers to this question.
- A. Planning mode > Bucket
- B. Scheduling control > Close gap
- C. Planning mode > Order priority
- D. Scheduling control > Find slot
Answer: A,D
NEW QUESTION # 59
What are some options for creating production orders without using trigger points?
Note: There are 2 correct answers to this question.
- A. In assembly production, a sales order triggers the creation of a production order
- B. In make-to-stock production, you can manually create production orders
- C. In assembly production, confirmation of scrap triggers the creation of a production order
- D. In make-to-stock production, confirmation of yield for sub-assembly triggers the creation of a production order
Answer: A,B
NEW QUESTION # 60
What data can you maintain in the items detail screen of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Change number
- B. Lot size
- C. Alternative item group
- D. Co-product
Answer: C,D
NEW QUESTION # 61
Which settings can you make in a production scheduling profile?
Note: There are 3 correct answers to this question.
- A. Automatic print on order creation
- B. Automatic goods receipt on confirmation
- C. Automatic goods issue on confirmation
- D. Default order types
- E. Automatic release on order creation
Answer: B,D,E
NEW QUESTION # 62
......